The proper installation of a distribution box involves placing it at the right height to ensure safety and convenience. Check for proper IP/NEMA ratings and material quality. Ensure safe placement: install in dry, accessible areas with good ventilation and at appropriate height (typically ~1. The fixing method should be firm and reliable to avoid movement or tilting of the box due to vibration or collision. It is recommended to use a. According to the "Code for Acceptance of Construction Quality of Building Electrical Engineering" GB50303-2002, the vertical distance between the bottom surface of the fixed stainless steel enclosure ip67 and the ground should be greater than 1. The bottom surface. Floor-mounted panels (cabinets) shall be elevated 5–10 mm above the ground.
[PDF Version]